For all new construction, major additions, and major
landscaping or vegetation management proposals the procedure for Design
Committee review, as administered by The Sea Ranch Association Department of
Design, Compliance & Environmental Management (DCEM) shall be as follows:
1. PRELIMINARY SITE VISIT
Prior to any submittal, the
lot owner and his/her architect or designer, if any, shall meet on the site
with a member of the Design Committee, Department of Design, Compliance &
Environmental Management Director or Operations Manager at which time there
shall be a discussion of specific site characteristics, constraints, and a
dissemination of general information regarding The Sea Ranch design
philosophy, design review process, and provision of application documents.
2. APPLICATION FOR DESIGN COMMITTEE REVIEW
An application form, filled
out by the owner or his authorized representative, together with the
appropriate application fee (See Design Review Fee Schedule) and signatures
shall be submitted to the Department of Design, Compliance & Environmental
Management with Conceptual Design Review submittal.
3.
CONCEPTUAL DESIGN REVIEW
This submittal provides the
opportunity for feedback from the Design Committee at the early stages of
design. Submittals shall be in duplicate in accordance with the Design
Committee Conceptual Submittal Checklist, due on Friday at 12:00 noon
one week prior to Design Committee meeting date. (Meetings are
normally scheduled for the first and third Fridays of each month). Study
models are strongly recommended. One set of plans shall be returned to the
architect/designer with any notations made thereon by the Committee.
3.1 REFERENCE STAKE
REQUIREMENT
Prior to conceptual submittal,
the owner or his/her representative shall approximately locate at-least one
stake on site (or more than one as relevant) to illustrate to the Design
Committee both location and orientation of proposed building. Location of
stake(s) shall be graphically indicated on submittal documents.
4. PRELIMINARY DESIGN
REVIEW
Submittals shall be in
duplicate in accordance with the Design Committee Preliminary Submittal
Checklist, due on Thursday at 12:00 noon, two weeks prior to the
Design Committee meeting (see enclosed schedule for submittal deadlines).
Following Design Committee review, owner shall be notified in writing of
approval, approval with conditions, or denial of approval with reasons for
such decision. One set of plans shall be returned to the architect/designer
with any notations made thereon by the Committee.
4.1 SITE STAKE-OUT
REQUIREMENTS
Prior to preliminary
submittal, the owner or his/her representative shall locate and “flag” the
corners of the lot; stake the corners of all proposed construction including
house, garage, decks, and fences; ribbon the entire perimeter and stake,
flag and ribbon the centerline of the driveway. (Please use plastic ribbon,
no string. Red=house, Blue=garage & decks, White=centerline of drive &
property corners).
In addition, in visually
sensitive areas, the Design Committee may require “storey” poles to indicate
maximum structure height. Owner or owner's representative shall notify the
department when staking installation is completed, so that neighbor
notification process may commence. All flagging and storey poles (if any)
shall be removed from site within 30 days of review by Design Committee.
(Note stakes may remain until construction commences)
4.2. ADJACENT OWNER
NOTIFICATION
At the time of preliminary
submittal, owners of adjacent properties within 300 feet of the boundaries
of the subject lot (or greater area as impacted by proposal) shall be
notified in writing by the Department of Design, Compliance & Environmental
Management of the submittal and are invited to examine the building stakeout
and the plans at the department office. Interested parties may then submit
their written comments to the Design Committee prior to the scheduled date
of review.
5. FINAL DESIGN REVIEW
Submittals shall be in
triplicate in accordance with the Design Committee Submittal Checklist, due
on Friday by 12:00 noon one week prior to Design Committee meeting.
The plans and specifications presented shall be the same construction
documents that are submitted to Sonoma County for a building permit.
Following Design Committee review, owners shall be notified in writing of
approval, approval with conditions, or denial of approval with reasons for
such denial. One set of plans shall be returned to the architect/designer
with any notations made thereon by the Committee. One set of plans shall be
provided to the building contractor upon issuance of the Sea Ranch
Construction Permit.
6. SEA RANCH CONSTRUCTION PERMIT
Following final approval and
submittal of the required construction performance deposit by the owner or
his contractor, a construction permit shall be issued by The Sea Ranch
Association Department of Design, Compliance & Environmental Management and
posted where visible at the site. It is advised that the Sonoma County
Building permit be obtained prior to issuance of this permit. All exterior
construction must be complete within 12 months from the issuance date of the
Sea Ranch Construction Permit (see 10. Violations below for 60 day
extension).
7. REQUIRED COMPLIANCE INSPECTIONS
7.1 Inspection of
Building Stakeout The Design Committee shall make at review of
preliminary plans.
7.2 Inspection of
Footing Forms (prior to pouring concrete) which verifies the
exact building location, shall be performed by a registered civil engineer
or land surveyor engaged by the owner, by certified drawing and letter to
the Department of Design, Compliance & Environmental Management. (Standards
provided with issuance of Sea Ranch Construction Permit).
7.3
Intermediate Inspection to determine overall exterior construction and
window and door opening conformance with approved final submittal documents
shall be performed by the Department of Design, Compliance & Environmental
Management staff.
7.4 Final Inspection
to verify that all exterior work has been completed in accordance with
approved final plans and approved modifications, if any. Following a
request for said inspection by the contractor or owner, The Department of
Design, Compliance & Environmental Management staff shall perform the final
inspection. A final inspection shall be automatically performed, if no
prior request, twelve months after issuance of the Sea Ranch Construction
Permit.
8. FINAL ACCEPTANCE
Final Acceptance shall occur
upon completion of all exterior work and approval by the Department of
Design, Compliance & Environmental Management staff. The department shall
initiate the process for a refund of the Construction Performance Deposit,
less any amount withheld as a penalty for late completion or as otherwise
provided by The Sea Ranch Restrictions and The Sea Ranch Association Rule on
the Policy and Procedures for Enforcement of Governing Documents-Attachment
‘C’.
9. CONSTRUCTION CHANGES AND MINOR
IMPROVEMENTS
Proposals for minor exterior
changes from previously approved plans or plans for minor additions or
alterations, refinishing of existing structure, landscaping or other
exterior improvements are subject to review by Design, Compliance &
Environment Management staff. Approval must be granted PRIOR to
implementing construction changes or minor improvements.
10. VIOLATIONS
Failure to obtain required
Design Committee approval for any exterior improvement constitutes a
violation of The Sea Ranch Restrictions. A violation also occurs upon
failure to complete all exterior work within 12 months from the date of
issuance of the Sea Ranch Construction Permit, unless a 60 day extension is
granted by Design, Compliance & Environmental Management staff.
Matters related to the resolution of violations and enforcement of rules and
regulations are under jurisdiction of The Sea Ranch Association and subject
to the provisions of The Sea Ranch Association Rule on the Policy and
Procedures for Enforcement of Governing Documents.
For reconstruction, minor additions or alterations,
refinishing of existing structures, minor landscaping and vegetation
management proposals, minor revisions to Design Committee review projects,
or any other exterior improvements review shall be conducted by The Sea
Ranch Association Department of Design, Compliance and Environmental
Management staff by authority and approval of the Design Committee. Consult
department staff for relevant application processes, forms, and fees.
The Sea Ranch
Association - Department of Design, Compliance & Environmental Management
PO Box 16 - 975 Annapolis Road - The Sea Ranch CA
95497-0016 (707) 785-2316
Office Hours 9 am – 4 pm, Tues. - Sat.
The Sea Ranch Association
Department of Design,
Compliance & Environmental Management
Fee Schedule
13. FEES
At their
February 18, 2006 Joint Budget meeting and April 22, 2006 meeting,
The Sea Ranch Association Board of Directors directed adoption of the
following schedule of fees for services, effective May 1, 2006
13.1
NEW RESIDENCE (To be paid in full with Conceptual Design
Review submittal)
13.1.1 Conceptual design
review
$750.00
13.1.2 Plan inspection
fee
$100.00
13.1.3 Preliminary design
review $3,600.00
13.1.4 Final design
review
$3,300.00
Total (for houses with up to 2,000 sq. ft. gross
living area) $7,750.00
Note: Premium for living area in
excess of 2,000 sq. ft.
to be paid at time
of issuance of TSRA Construction Permit
$6/sq.ft.
13.2
Additions/Modifications (Existing structures)
13.2.2 Minor
Alteration
$180.00**
13.2.3 Major
Alteration $360.00
13.2.4 Up to 500 square foot
addition $1,800.00
13.2.5 Over 500 square foot
addition $3,600.00
13.3 Changes/Modifications During Construction $180.00**
13.4 Final
Inspections (Repeat) N/C** ***
Two final inspections are done for no
charge. Should additional inspections be necessary, a fee may be charged
for each additional inspection per Attachment ‘C’ – The Sea Ranch
Association Rule on The Policy and Procedures for Enforcement of Governing
Documents.
13.5 Landscaping/Planting Requests $180.00**
13.5.1 Tree trimming/removal
requests N/C*
* Review and approval
required
** Design, Compliance & Environmental Management Dept. Directors or
Operations Manager may waive Fee
***
Deduction from Construction Compliance Deposit, or if insufficient or no
deposit, shall be billed to Owner per CC&R section 3.03 (k).
13.6 Extensions of Approvals
Approval of
preliminary and/or final plans is good for one year. If unable to proceed
with final plans or construction, an extension must be requested in writing
prior to the expiration date. The Design Committee, DCEM Directors or
Operations Manager may approve or disapprove a request for extension.
13.6.1
First year extension beyond original approval expiration date $500.00
(Reviewed by DCEM
Directors or Operations Manager)
13.6.2 Extension of approval
of plans, after two years
$2,160.00
(Must be re-reviewed
by the Design Committee)
13.7 Field Compliance Inspection
$270.00
(Letter for a Title Company, Real Estate
Agent, Seller, etc.)
13.8 Variance Requests (waiver of
Restrictions or Rules) $1,500.00
Height Variance/Bulk Variance Requests (Bane
Bill Lots up to 25%)
13.9
Septic System Review
13.9.1 Percolation Test $180.00
13.9.2 Septic Plan
Review: On-Site System $360.00
13.9.3 Septic Plan
Review: System on Commons $720.00
13.10 Encroachment Permits $240.00
Encroachment permit to perform work on
commons
13.11
Consolidation of Lots
$1,000.00
(Design Committee and Board of Directors must approve consolidation)
(Requires dues through fiscal year of lot to be consolidated)
14. REFUNDABLE DEPOSITS
14.1 Construction Performance Deposit
14.1.1 New
residence $10,000 (or bond)
14.1.2 Additions (Up to 500 square feet) $3,000 (or
staff discretion)
14.1.3 Additions (Over 500
square feet $6,500 (or
bond)
14.2 Percolation Test $250.00
14.3 Encroachment Permits
14.3.1 Septic installation
on commons $500 - $2000
14.3.2 Diverter drain
installation prior to construction of dwelling
or on commons
$200 - $1000
14.3.3 Tree Removal/Pruning
- (On commons) $200 - $500
14.3.4 Material Delivery -
(Over commons) $200 - $500
14.3.5 Percolation Test –
(On commons) $250 - $1000
The
Sea Ranch Association - Department of Design, Compliance & Environmental
Management
PO
Box
16 - 975 Annapolis Road
- The Sea Ranch CA 95497-0016 (707) 785-2316
Office Hours
9 am – 4 pm,
Tues. - Sat.